The mini-FOBOS experiment

Reaction: 235U(n,f)
Planned duration: 13.03.2006 - 18.12.2006
Aim: data taking
Status: Finished
OFF-LINE                     
Mini-FOBOS at IBR-2 About Mini-FOBOS
Tutorialls
The electronic equipment
The gas-vacuum system
The high-voltage module
GMP
Tuned matrices
Bit controlled
No bits


Special Start Avalanche Counter
Bragg Ionization Chamber
Large Area Position Sensitive Avalanche Counter
Ni mesh, 75% transparency
ON-LINE                  
Web-cameras



Watch lodge
Monitoring

PS-Anywhere
Shifts
Logbook